The home is built in a factory, but the place it sits is built by you. Good site prep is the difference between a smooth delivery day and an expensive delay. Here's what to think about before your home ships.
1. Access for the delivery truck
Each section travels on its own chassis behind a truck. The path from the road to your pad needs enough width, firm ground and clearance from trees, fences and power lines. Tight turns, soft ground after rain and low branches are the most common delivery-day problems.
2. A level, well-drained pad
North Texas clay soil moves when it gets wet and dry. The pad should be cleared, compacted, level and graded so water drains away from the home. Many buyers use a gravel or concrete pad, or concrete runners under the piers.
3. Utilities
- Electric: a service pole or meter base sized for the home.
- Water: city water, a water co-op or a well.
- Wastewater: a city sewer tap or a septic system. On rural land, septic is usually the biggest site cost and needs a licensed designer and installer.
4. Permits and local rules
Requirements vary by city and county. Some cities restrict where manufactured homes can go; most rural county land is more flexible. Septic permits, driveway culverts and floodplain rules can apply too. Check before you buy land, not after.
5. Finishing work after the home is set
After installation you'll still need steps or a deck at each door, skirting, A/C hookup and final utility connections. Plan for these in your budget.
We'll look at it with you
Send us your address or a few photos of the property and we'll tell you what we see — access, pad and anything that could slow down delivery. See our delivery and setup page for how the process works.